IS 456:2000 CODE ENGINEZero Wastage Algorithm
Contractor Site Material Estimator
Compute accurate Bill of Materials (BOM) for cement, TMT rebars, AAC blocks, sand & paints with 1-click cart fulfillment
Site Dimensions & Scope
Enter built-up or slab carpet area
SQ. FT.
Quick Jaipur Plot Presets:
Site Wastage Cushion Included (5%)
Algorithm incorporates structural lap lengths, binding wire allowance, and formwork vibration settlement.
Computed Bill of Materials (1,200 Sq. Ft.)
Direct Factory Depot Rates (Jaipur Delivery Included)
🏗️
₹1,91,52053 Grade High-Strength OPC CementRequired: 504 Bags (50kg each) @ ₹380/bag
🔩
₹2,96,400Fe 550D TMT Structural Rebars (8mm-16mm)Required: 4,560 KG @ ₹65/kg
🧱
₹2,18,400Steam-Cured AAC Masonry BlocksRequired: 3,360 Units @ ₹65/block
🎨
₹41,760Exterior Weatherproof Wall PaintRequired: 144 Litres @ ₹290/L
⏳
₹51,600Washed Plaster Sand & AggregateRequired: 43 Metric Tons @ ₹1,200/MT
Total Estimated BOM ValueIncl. Direct Jaipur Site Delivery & GST ITC
₹7,99,680